529 Greenwood Avenue S.E.
East Grand Rapids, Michigan
Phone (616) 451-3346
A Woman-Owned Small Business
Home • Firm Profile • Connect
MCSA Group has provided comprehensive planning, design and engineering services for 70 Miles of White Pine Trail including final design, construction documents and construction administration for asphalt paving of 28 miles of the trail to date.
Trail bridge over Mill Creek for multi-use linear park was constructed utilizing sheet pile abutments which minimized construction impact on the Creek. Improved bridges are 14’-0” wide, consistent with AASHTO Standards for 10’-0” wide bike trails.