The assessment reviewed the condition of the Academy’s seven slate roofs.  We worked with a local contractor to gain access to the roofs.  The findings prioritized the required work in response to funding limitations.  A sampling of the report is shown in the images above.

Return To
PLANNING AND DESIGN > FACILITY ASSESSMENTS