A Phase 100 study was completed for the State of Michigan to determine the causes of water intrusion into the building envelope.  Once the multiple problem areas were identified, a corrective plan with estimate was completed forming a basis for the State to resolve the issues.

A sampling of the report is shown in the images above.

Return To
PLANNING AND DESIGN > FACILITY ASSESSMENTS